Crucible is one of the important equipment for alloy melting. It is a container for melting and refining metal liquids, as well as for solid-liquid heating and reaction. It is the foundation for producing high-quality castings.

Handling and storage of crucibles


Special handling tools must be used to transport crucibles, and crucibles cannot be rolled directly on the ground. During transportation, collision should be avoided to prevent damage to the glaze layer, which may affect the service life of the crucible.


The crucible must be stored in a dry and ventilated place, preferably on a wooden rack. Avoid placing the crucible directly on a brick, soil, or cement floor. Moisture can damage the glaze layer of the crucible, reducing its melting efficiency and service life. In severe cases, the bottom may even fall off.




Characteristics of silicon carbide graphite crucible


(1) Fast thermal conductivity: With high thermal conductivity, it can significantly shorten smelting time and cycle, saving energy;


(2) High strength: formed by isostatic pressing, with no defects in the internal structure and high physical strength;


(3) Antioxidant: Unique antioxidant design and use of high-purity raw materials to protect graphite, high antioxidant performance;


(4) Corrosion resistance: low porosity, special additives, effectively resist the chronic effects of molten materials such as slag removers;


(5) Long lifespan: Compared with ordinary graphite clay crucibles, the lifespan can be extended by 3-5 times.




Preparation work before installation


(1) Check whether the inner wall and bottom of the crucible furnace are intact and undamaged.


(2) Check if there is any residual slag in the furnace, and if so, remove it promptly.




Choose the correct crucible base


(1) The crucible base should have the same shape as the bottom of the crucible and be slightly larger in size (about 2CM).


(2) Suitable height crucible bases should be selected for different types of crucible furnaces.


(3) Avoid using discarded crucible bases, as this will greatly shorten the lifespan of the crucible.




Installation and fixation of crucible


(1) To install a crucible for gas or oil furnaces, first place the crucible on the base and reserve a certain amount of crucible expansion space between the crucible and the top of the furnace wall. Use materials such as wooden blocks and cardboard to fix it. Adjust the position of the burner and nozzle to align the flame with the combustion chamber, not directly with the bottom of the crucible;


(2) When installing a crucible for a rotary furnace, support bricks should be used to fix the crucible on both sides of the pouring nozzle, avoiding wedging the crucible tightly. At the same time, 3-4mm cardboard or other materials should be placed between the support bricks and the crucible as a pre expansion space for the crucible;


(3) The crucible for installing the resistance furnace should be placed in the central part of the furnace, with the bottom of the crucible higher than the bottom row of heating elements. At the same time, insulation cotton should be used to seal the top and between the crucibles.


(4) Install the crucible for the induction furnace to ensure that it is placed in the center of the induction coil to prevent local overheating and cracking of the crucible.




Preheating/First use of crucible


Preheating the crucible in the correct way can greatly extend its service life.


(1) According to different types of crucible furnaces, when using the crucible for the first time, preheat it to around 200 ℃ for 60-120 minutes without adding any materials, and dry it for 60 minutes. The purpose is to evaporate the water absorbed on the surface of the crucible. Prevent bursting during initial use.


(2) After preheating, the crucible should be heated to 800 ℃ (about 2 hours) as soon as possible, and kept warm for 20-30 minutes, then raised or lowered to the working temperature. The purpose is to quickly pass through the easily oxidizable temperature range of the graphite crucible.


(3) After the first preheating, the crucible usually does not need to be preheated again unless it becomes damp again.




New crucible and crucible cooled for a long time


Note that if the silicon carbide graphite crucible is not properly preheated, it is easily subjected to thermal stress impact. For large capacity furnaces and/or furnaces with high output burners, the following crucible preheating procedures must be followed to avoid damage to the crucible due to thermal shock;


(1) Slowly heat the empty crucible at a heating rate of 200 ℃ for 2 hours to remove moisture;


(2) Heat the crucible at a rate of 600 ℃ for 2 hours;


(3) Heat the crucible to 800 ℃ at the normal heating rate. The crucible used for aluminum insulation must be kept at 800 ℃ for about 30 to 40 minutes to fully utilize the glaze layer on the surface of the crucible.


(4) After the above steps, the crucible can be safely put into normal use. During use, it is also necessary to follow the crucible safety operating procedures.


  


After the first use and normal use of the crucible


(1) Load the furnace.


(2) Heat slowly with low power to 600 ℃. When the crucible is not used for a long time, it should be preheated at a heating rate of 2 hours to 200 ℃ and relevant operating rules should be followed.


(3) Heat the crucible to the specified temperature with full power,




The heating program depends on the frequency of furnace use, coil size, and the resistivity of the molten metal. The furnace design and crucible material determine whether an empty crucible can be preheated. If conditions permit, preheating the crucible would be better. Silicon carbide graphite crucibles are more susceptible to thermal shock and must be heated slowly.


Note: For tilting furnaces, the furnace top cover must be air dried with an electric induction or flame heater before starting to use the crucible.


For furnaces with frequencies above 1kHz:


(1) Suggest preheating the empty crucible. Heat the crucible at 20% of maximum power until it turns red hot.


(2) After 30 minutes, the heating power can be adjusted to 50% of the maximum power.


(3) Maintain 50% of the maximum power and add a metal block until the metal liquid fills half of the crucible volume.


(4) Increase power.


Be careful not to overheat the crucible. After the metal melts and fills the crucible, reduce the electrical power to avoid crucible corrosion.




For furnaces with frequencies below 1kHz:


(1) The heating efficiency of an empty crucible is relatively low, so it is necessary to put some metal blocks into the preheating crucible to improve the preheating effect.


(2) Heat the crucible at 20% of maximum power until it turns red hot.


(3) If the crucible powder turns red hot within half an hour, please heat the crucible at 50% of its maximum power.


(4) Keep heating at 50% of maximum power until the metal liquid fills half of the crucible volume before increasing the heating power




Feeding


(1) Metal materials must be dried before being added.


(2) When adding materials, they should be gently placed down and the metal ingot should not be thrown or poured into the crucible to avoid damaging it.


(3) Place the metal ingot vertically into the crucible, leaving sufficient expansion space between the ingot and the crucible wall. Do not place the metal ingot horizontally inside the crucible to prevent it from expanding and damaging the crucible after heating.


(4) You can first add some small pieces of metal material into the crucible as a cushion for large ingots.


(5) During continuous melting, a portion of the molten metal can be retained in the crucible to accelerate the melting rate. But it is necessary to avoid adding large pieces of metal material to a small amount of molten metal, in order to prevent the molten metal from rapidly cooling or solidifying and damaging the crucible.


(6) When adding liquid metal, avoid overfilling and generally do not exceed 80% of the crucible capacity.




The use of additives


When using additives, it is necessary to strictly follow the instructions for using the additives.


(1) Additives can only be added after the metal material has completely melted. Do not put additives in empty crucibles or solid metal materials, otherwise it will directly damage the crucible.


(2) When using additives, it is necessary to strictly follow the prescribed dosage, as excessive use of additives can greatly shorten the lifespan of the crucible.


主站蜘蛛池模板: 国产欧美日本亚洲精品五区 | 日产国产欧美视频一区精品 | 四虎永久| 正在播放国产精品 | 一本色综合亚洲精品蜜桃冫 | 精品亚洲福利一区二区 | 国产一毛片 | 天天爽夜夜爽人人爽一区二区 | 91成人免费网站 | 中文字幕av无码一二三区电影 | yy6080久久伦理一区二区 | 亚洲人ⅴsaⅴ国产精品 | 波多野结衣中文在线观看 | 国内成人自拍视频 | 强奷乱码中文字幕 | 女人被狂c躁到高潮视频 | 把女邻居弄到潮喷的性经历 | 国产精品无码一区二区三区在 | 搡老岳熟女国产熟妇 | 特大黑人娇小亚洲女 | 无码专区3d动漫精品免费 | 亚洲欧美中日韩中文字幕 | 精品水蜜桃久久久久久久 | 亚洲精品中文字幕无码蜜桃 | 精品无码国产一区二区日本 | 91av国产在线 | 粗大的内捧猛烈进出看视频 | 国产色诱视频在线观看 | 天天影视综合网 | 亚洲va久久久噜噜噜久久天堂 | 久久久国产一区二区三区四区小说 | 国产亚洲精品久久精品6 | 免费级毛片 | 国产精品成熟老女人 | 高潮又爽又无遮挡又免费 | 免费又粗又硬进去好爽A片视频 | 欧美性生交xxxxx久久久 | av无码精品一区二区三区宅噜噜 | 91日本在线观看亚洲精品 | 精品成人免费 | 丝袜美腿一区二区三区动态图 | 看一级毛片国产一级毛片 | 国产午夜精品理论片免费观看 | 亚洲一区二区免费 | 亚洲精品无码久久毛片 | 美女国产精品 | 亚洲精品日韩在线 | 亚洲风情亚aⅴ在线发布 | 国产动作大片中文字幕 | 99久久久无码国产精品性 | 久久一区二区三区精品 | 无遮挡又爽又刺激的视频 | 欧美午夜精品一区二区三区电影 | 高清无码视频直接看 | 国产三级福利 | av电影直播 | 狠狠干天天 | 日本一本久 | 国产精品久久久久久一区二区三区 | 天天爽天天操 | 精品久久久久久无码免费 | 男女真实无遮挡xx00动态图120秒 | 久久精品中文 | 99热这里有精品 | 超碰97在线人人 | 亚洲 自拍 另类小说综合图区 | 久久aⅴ乱码一区二区三区 日韩精品一区二区在线观看 | 欧美一级网站 | 亚洲人妻av伦理 | 亚洲精品国产品国语在线观看 | 中文字幕第页 | 国产精品免费无遮挡无码永久视频 | 欧美激情第1页 | 成人黄色短视频在线观看 | 闲人综合网 | 久久精品动漫一区二区三区 | 久久免费福利 | 4hu四虎永久免费地址ww416 | 午夜片神马影院福利 | 国产精品麻花传媒二三区别 | 日本三级香港三级网站 | 18禁肉肉无遮挡无码网站 | 欧美成在线播放 | 朝鲜女人大白屁股ass | 亚洲v日本v欧美v综合v | 欧美一级毛片欧美毛片视频 | 久久久无码中文字幕久... | 免费a级毛片 | 成人区人妻精品一区二区三区 | 梦中人在线观看免费完整版 | 亚洲精品久久婷婷丁香51 | 五月婷婷狠狠干 | 黑色丝袜三级在线播放 | 国产成人福利视频在线观看 | 老司机福利在线视频 | 国产免费A片好硬好爽好深小说 | 久久久中日ab精品综合 | 52avcom| av在线二区|